top of page
Aircraft under maintenance, checking mechanical systems for flight operations. Plane in th

Electrical Engineering

Project

HARMONIC DISTORSION EVALUATION

Customer: High School of Vannes

Activity area: Electrical Engineering testing

Project Duration: 6 months

Picture1.jpg

Source :Harmonic Distortion report 2006

Picture2.jpg

Source :Harmonic Distortion report 2006

Scope of work:

- Identification of the harmonic distortion origins
- Analysis of the perturbations on the main power supply
- Definition of electronic filters to isolate harmonic current from damage due to harmonic voltage distortion
- Assessment of the effects on the electrical network
- Development of a test bench composed of 2 units (Power supply and loads) reproducing the harmonic phenomena in the industrial environment

MISSILE DEFENCE SYSTEM DEVELOPMENT

Customer: MBDA Missile System

Activity area: Electrical Wiring Design & Methods

Project Duration: 12 months

10515507694809abc8d0ce9d33a27e24-2000x1125.jpg

Source : MBDA System

Picture1.jpg

Source : Zuken

Scope of work:

- Support of the system architecture definition
- Electrical wiring design on E3Series

- Definition of the harness report for the manufacturing

- Support of the integration and harware validation phase

- Creation of advanced standards and specificaton in the frame of electrical wiring design on E3Series

A350 XWB FINAL ASSEMBLY LINE

Customer: Airbus

Activity area: Production Support & Liaison Engineering

Project Duration: 2 years and 6 months

Picture2.jpg
Picture1.jpg

Source : Airbus

Scope of work:

- Technical investigation including diagnostic, troubleshooting, and technical repair solution design
- Daily support for the electrical harness installation and manufacturing
- Secure the outstanding work with the production
- Work hand in hand with production and production support groups (Methods/manufacturing, Quality, and Logistics) to fix and resolve operational or engineering issues on aircraft

LEAP-1A FTB ENGINE PYLON

Customer: GE aerospace

Activity area: Electrical Design & Manufacturing

Project Duration: 6 months

92890_leapengine_665436.jpg

Source : Airbus

800x600_1348783200_A350XWB_Pylon.jpg

Source : Airbus

Scope of work:

- Provide detailed design, manufacturing drawings and  assembly for the whole electrical wiring system.
- Digital mock-up Integration and harness installation
- Electrical harness manufacturing coordination
- Support the installation and hardware on the Flight Test Bed

K9K GEN8 EURO6D ENGINE

Customer: Renault

Activity area: Electrical Design & Manufacturing

Project Duration: 1 year & 4 Months

Capture.JPG

Source : Renault

sews-patch-snake.jpg

Source : SEWS-E

Scope of work:

- Electrical harness drawing design
- Manufacture harness mock-up to validate the  manufacturing process
- Validate the production and assembly process for the
mass production (tooling, crimping, test,…)

- Validate the electrical test

- Liaise with the customer to support the installation and  hardware in the vehicle
 

AIRCRAFT SYSTEM ENGINEERING

Customer: Swiss International Air Lines

Activity area: Continuing Airworthiness - Electrical & Avionics systems

Project Duration: 5 years and 3 months

1747214939748.jfif
Capture.JPG

Source : SWISS

Scope of work:

- Ensures compliance with aircraft systems and components
- Assess and/or define maintenance requirements
- Monitor aircraft systems' data, analyze reliability trends

- Assesses and proposes technical upgrades and modifications to improve reliability and costs

- Liaises with OEMs and vendors on technical issues

- Technical investigations (Safety Management System)

- Implements corrective actions

- Plans, monitors, and reports budgetary figures

EXPEREMENTAL ELECTRIC AIRCRAFT

Customer: H55/BRM Aero

Activity area: Electrical & Avionics systems - Testing

Project Duration: 2 Months

ENERGIC-45-scaled.jpg

Source : H55

IMG_0017.jpg

Source : ETS Montreal

Scope of work:

- Aircraft/System Integration: Support aircraft-level integration activities, including creating wiring diagram and updating technical manuals.

- Testing and Validation: Conduct bench and ground tests of the electrical power DC/DC converter to validate performance and compliance.

I'd love to hear from you if you're interested in my service! Feel free to reach out to discuss any form of collaboration.

Let's connect!

© 2025 by David Goasmat
bottom of page