DAVID GOASMAT
dgoasmat56@gmail.com

Electrical Engineering
Project
HARMONIC DISTORSION EVALUATION
Customer: High School of Vannes
Activity area: Electrical Engineering testing
Project Duration: 6 months

Source :Harmonic Distortion report 2006

Source :Harmonic Distortion report 2006
Scope of work:
- Identification of the harmonic distortion origins
- Analysis of the perturbations on the main power supply
- Definition of electronic filters to isolate harmonic current from damage due to harmonic voltage distortion
- Assessment of the effects on the electrical network
- Development of a test bench composed of 2 units (Power supply and loads) reproducing the harmonic phenomena in the industrial environment
MISSILE DEFENCE SYSTEM DEVELOPMENT
Customer: MBDA Missile System
Activity area: Electrical Wiring Design & Methods
Project Duration: 12 months

Source : MBDA System

Source : Zuken
Scope of work:
- Support of the system architecture definition
- Electrical wiring design on E3Series
- Definition of the harness report for the manufacturing
- Support of the integration and harware validation phase
- Creation of advanced standards and specificaton in the frame of electrical wiring design on E3Series
A350 XWB FINAL ASSEMBLY LINE
Customer: Airbus
Activity area: Production Support & Liaison Engineering
Project Duration: 2 years and 6 months


Source : Airbus
Scope of work:
- Technical investigation including diagnostic, troubleshooting, and technical repair solution design
- Daily support for the electrical harness installation and manufacturing
- Secure the outstanding work with the production
- Work hand in hand with production and production support groups (Methods/manufacturing, Quality, and Logistics) to fix and resolve operational or engineering issues on aircraft
LEAP-1A FTB ENGINE PYLON

Source : Airbus

Source : Airbus
Scope of work:
- Provide detailed design, manufacturing drawings and assembly for the whole electrical wiring system.
- Digital mock-up Integration and harness installation
- Electrical harness manufacturing coordination
- Support the installation and hardware on the Flight Test Bed
K9K GEN8 EURO6D ENGINE
Customer: Renault
Activity area: Electrical Design & Manufacturing
Project Duration: 1 year & 4 Months

Source : Renault

Source : SEWS-E
Scope of work:
- Electrical harness drawing design
- Manufacture harness mock-up to validate the manufacturing process
- Validate the production and assembly process for the
mass production (tooling, crimping, test,…)
- Validate the electrical test
- Liaise with the customer to support the installation and hardware in the vehicle
AIRCRAFT SYSTEM ENGINEERING
Customer: Swiss International Air Lines
Activity area: Continuing Airworthiness - Electrical & Avionics systems
Project Duration: 5 years and 3 months


Source : SWISS
Scope of work:
- Ensures compliance with aircraft systems and components
- Assess and/or define maintenance requirements
- Monitor aircraft systems' data, analyze reliability trends
- Assesses and proposes technical upgrades and modifications to improve reliability and costs
- Liaises with OEMs and vendors on technical issues
- Technical investigations (Safety Management System)
- Implements corrective actions
- Plans, monitors, and reports budgetary figures
EXPEREMENTAL ELECTRIC AIRCRAFT
Customer: H55/BRM Aero
Activity area: Electrical & Avionics systems - Testing
Project Duration: 2 Months

Source : H55

Source : ETS Montreal
Scope of work:
- Aircraft/System Integration: Support aircraft-level integration activities, including creating wiring diagram and updating technical manuals.
- Testing and Validation: Conduct bench and ground tests of the electrical power DC/DC converter to validate performance and compliance.